subject
Engineering, 03.07.2020 14:01 cheervolley

It is known that after the concrete is adjusted by trial mixing, the amount of various materials is: cement 3.10kg, water 1.86kg, sand 6.24kg, crushed stone 12.8kg, and the apparent density of the mixture is 2500kg βˆ• m3 . : (1)How much is the amount of per cube concrete material? (2)If the moisture content of sand at the construction site is 2.5%, and the moisture content of stone is 0.5%, find the construction mix ratio.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit.explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
question
Engineering, 04.07.2019 18:10
Ariver flows from north to south at 8 km/h. a boat is to cross this river from west to east at a speed of 20 km/h (speed of the boat with respect to the earth/ground). at what angle (in degrees) must the boat be pointed upstream such that it will proceed directly across the river (hint: find the speed of the boat with respect to water/river)? a 288 b. 21.8 c. 326 d. 30.2
Answers: 3
question
Engineering, 04.07.2019 18:10
Items are similar to the free issue items, but their access is limited. (clo5) a)-bin stock items free issue b)-bin stock controlled issue c)-critical or insurance spares d)-rebuildable spares e)-consumables
Answers: 1
question
Engineering, 04.07.2019 18:10
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
You know the right answer?
It is known that after the concrete is adjusted by trial mixing, the amount of various materials is:...
Questions
question
Engineering, 05.12.2019 18:31