subject
Engineering, 20.06.2020 17:57 james2811

H. W 1: A (6 m) layer of sand overlies a (5 m) thick layer of clay with a sand deposit beneath. The water table is to be lowered permanently from (1 m) below ground level to (4 m) below ground level, by pumping from the sand over a period of (6 weeks). Determine the settlement due to consolidation of the clay layer 6 months) from the start of pumping. For the clay: m2 my = 0.45 m² / MN and cy = 5.5 year 0.008 0.031 0.071 0.126 0.196 0.287 0.403 0.567 Ty U% 10 20 30 | 40 50 60 70 80

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Water in a partially filled large tank is to be supplied to the roof top, which is 8 m above the water level in the tank, through a 2.2-cm-internal-diameter pipe by maintaining a constant air pressure of 300 kpa (gage) in the tank. if the head loss in the piping is 2 m of water, determine the discharge rate of the supply of water to the roof top in liters per second.
Answers: 3
question
Engineering, 04.07.2019 18:10
Hydraulic fluid with a sg. of 0.78 is flowing through a 1.5 in. i.d. pipe at 58 gal/min. the fluid has an absolute viscosity of 11.8 x 105 lbf-sec/ft2. is the flow laminar, turbulent or within the critical range? give both a numerical reynolds number and a term answer.
Answers: 3
question
Engineering, 04.07.2019 18:20
Agas mixture consists of 8 kmol of h2 and 2 kmol of n2. determine the mass of each gas and the apparent gas constant of the mixture.
Answers: 3
question
Engineering, 04.07.2019 19:10
What is the main objective of using reheat rankine cycle?
Answers: 3
You know the right answer?
H. W 1: A (6 m) layer of sand overlies a (5 m) thick layer of clay with a sand deposit beneath. The...
Questions
question
Mathematics, 29.01.2021 07:00
question
Physics, 29.01.2021 07:00
question
Mathematics, 29.01.2021 07:00
question
Mathematics, 29.01.2021 07:00
question
Mathematics, 29.01.2021 07:00