Prepare a construction schedule for the following work items to be installed by the contractor. Identify a critical path.
Include:
• Submittal preparation by contractor,
• Submittal review (1 week by engineer)
• Order lead time (2 weeks for earthwork and pavement markings; 4 weeks for drainage materials, 6 weeks for paving, curb and drainage castings; 12 weeks for traffic and lighting: 16 weeks for trees)
• Order of construction, duration of items, and interrelation between items.
• Keep crews consistently employed - do not assume you have any other projects for the crews to work on.
• Keep crews out of each other's way
• Earthwork/drainage/concrete/curb crew - one set of people and equipment
• Street lighting foundations (excavation and concrete piers) 8/day/crew
• Traffic signal foundations (excavation and concrete piers) 4/day/crew
• Drainage systems mainline (trench, pipe, backfill with native soil, compaction
6-inch lifts, trench pavement repair) 100 ft/day crew.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Afull journal bearing has a journal diameter of 27 mm, with a unilateral tolerance of -0.028 mm. the bushing bore has a diameter of 27.028 mm and a unilateral tolerance of 0.04 mm. the l/d ratio is 0.5. the load is 1.3 kn and the journal runs at 1200 rev/min. if the average viscosity is 50 mpa-s, find the minimum film thickness, the power loss, and the side flow for the minimum clearance assembly.
Answers: 1
question
Engineering, 04.07.2019 18:10
An air compression refrigeration system is to have an air pressure of 100 psia in the brine tank and an allowable air temperature increase of 60°f for standard vapor compression cycle temperatures of 77 f entering the expansion cylinder and 14 f entering the compression cylinder, calculate the coefficient of performance a. 2.5 b 3.3 c. 4.0 d. 5.0
Answers: 3
question
Engineering, 04.07.2019 18:20
Atank with constant volume contains 2.27 kg of a mixture of water phases (liquid-vapor). in the initial state the temperature and the quality are 127 °c and 0.6, respectively. the mixture is heated until the temperature of 160 oc is reached. illustrate the process in a t-v diagram. then, determine (1) the mass of the vapor in kg at the initial state, (2) the final pressure in kpa.
Answers: 3
question
Engineering, 04.07.2019 18:20
Amixture of slurry and mud is to be pumped through a horizontal pipe of diameter 500 mm. the fluid behaves as a bingham plastic with a yield stress of 30 pa and viscosity 0.04 pa.s. describe the effects of the shear stress through a transverse section of the pipe by plotting the variation in shear stress and velocity profile: (i) just before the slurry starts to move (ii) as the slurry flows when the pressure gradient is double that in part (i)
Answers: 3
You know the right answer?
Prepare a construction schedule for the following work items to be installed by the contractor. Iden...
Questions
question
English, 05.12.2020 22:20
question
Biology, 05.12.2020 22:20
question
Mathematics, 05.12.2020 22:20
question
English, 05.12.2020 22:20
question
Social Studies, 05.12.2020 22:20
question
Mathematics, 05.12.2020 22:20
question
Mathematics, 05.12.2020 22:20
question
Mathematics, 05.12.2020 22:20