subject
Engineering, 06.05.2020 05:41 benjamingom030

A piece of corroded steel plate was found in a submerged ocean vessel. It was estimated that the original area of the plate was 10 in2 and that approximately 2.6 kg had corroded away during the submersion. Assuming a corrosion penetration rate of 200 mpy for this alloy in seawater, estimate the time of submersion in years. (convert the time from hours to years). The density of steel is 7.9 g/cm3. K

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
question
Engineering, 04.07.2019 18:20
Aheavily insulated piston-cylinder device contains 0.02 m3 of steam at 300 kpa and 200 °c. 1.2 mpa. d this process. team is now compressed in a reversible manner to a pressure of etermine the entropy change and the work done on the steam during this process
Answers: 1
question
Engineering, 04.07.2019 19:10
When subject to a steady load (within elastic range) over a long period of time, what is the major difference in material behavoir between steel and plastic?
Answers: 2
question
Engineering, 04.07.2019 19:10
Estimate the change in specific internal energy au and specific enthalpy h from inlet to outlet for ethylene glycol (a liquid) flowing through each of the following devices: (a) a heat exchanger where the glycol temperature increases from 20 °c to 80 °c; (b) a pump operating at about 25 °c and increasing the glycol pressure from 100 kpa to 8 mpa.
Answers: 2
You know the right answer?
A piece of corroded steel plate was found in a submerged ocean vessel. It was estimated that the ori...
Questions
question
Mathematics, 24.02.2021 17:10
question
English, 24.02.2021 17:10
question
History, 24.02.2021 17:10
question
Mathematics, 24.02.2021 17:10
question
Mathematics, 24.02.2021 17:10