subject
Engineering, 05.05.2020 17:35 mollywolly99

Question 9.1 from the textbook. Consider the following workload: Process Burst Time Priority Arrival Time P1 50 4 0 P2 20 1 20 P3 100 3 40 P4 40 2 60 Show the schedule using shortest remaining time, non-preemptive priority (a smaller number implies higher priority) and round robin with quantum 30, Make each entry in your answer equal to 10 time units. For example if your algorithm was FCFS then your answer would be: P1 P1 P1 P1 P1 P2 P2 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P4 P4 P4 P4

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Manometers are good examples of measuring instruments, nowadays they are not as common as before. a)-capacitive probe gauges b)-gravitational gauges deformation ) gauges d)-digital gauges
Answers: 1
question
Engineering, 04.07.2019 18:20
The characteristic roots of a dynamic system are: 1.7920 1.8160 i, -1.7920 1.8160 i, -0.4160 what is the order of this system? what are the settling time and damping ratio of the system?
Answers: 3
question
Engineering, 04.07.2019 18:20
How much power could a wind turbine produce if it had the following specifications? cp = 0.45 -d=1.2kg/m3 d=50m v 5m/s
Answers: 2
question
Engineering, 04.07.2019 18:20
A2-m rigid tank initially contains saturated water vapor at 100 kpa. the tank is connected to a supply line through a valve. steam is flowing in the supply line at 600 kpa and 300 c. the valve is opened, and steam is allowed to enter the tank until the pressure in the tank reaches the line pressure, at which point the valve is closed. a thermometer placed in the tank indicates that the temperature at the final state is 200°c. determine (a) the mass of steam that has entered the tank (b) the amount of heat transfer.
Answers: 3
You know the right answer?
Question 9.1 from the textbook. Consider the following workload: Process Burst Time Priority Arrival...
Questions
question
Social Studies, 25.06.2019 04:30