Engineering, 06.05.2020 02:17 sarbjit879

A masonry facade consisting of 3,800 square feet is to be constructed for a building. The total cost per worker hour is estimated to be $31.50, and the total estimated cost of the labor for this task is $10,500. Assuming 8-hour work days and a crew of six workers, how many days should be allowed to complete this task? What is the production rate that the crew must attain to keep the project on schedule and within the budget?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Steel is coated with a thin layer of ceramic to protect against corrosion. what do you expect to happen to the coating when the temperature of the steel is increased significantly? explain.
Answers: 1
question
Engineering, 04.07.2019 18:10
The filament of an incandescent lamp has a temperature of 2000k. calculate the fraction of radiation emitted in the visible light band if the filament is approximated as blackbody
Answers: 2
question
Engineering, 04.07.2019 18:20
The characteristic roots of a dynamic system are: 1.7920 1.8160 i, -1.7920 1.8160 i, -0.4160 what is the order of this system? what are the settling time and damping ratio of the system?
Answers: 3
question
Engineering, 04.07.2019 19:10
How to increase the thermal officiency of an ideal simple rankino cycle? among these methods, which one is the best and why?
Answers: 2
You know the right answer?
A masonry facade consisting of 3,800 square feet is to be constructed for a building. The total cost...
Questions
question
Mathematics, 13.01.2021 09:20
question
Mathematics, 13.01.2021 09:20
question
History, 13.01.2021 09:20
question
Arts, 13.01.2021 09:20
question
Mathematics, 13.01.2021 09:20
question
Mathematics, 13.01.2021 09:20
question
Social Studies, 13.01.2021 09:20
question
Mathematics, 13.01.2021 09:20
question
History, 13.01.2021 09:20
question
Chemistry, 13.01.2021 09:20