subject
Engineering, 06.05.2020 03:27 agilitygirl1

Assume that the initial means and variances of two clusters in a GMM are as follows: μ(1)=−3 , μ(2)=2 , σ21=σ22=4 . Let p1=p2=0.5 . Let x(1)=0.2 , x(2)=−0.9 , x(3)=−1 , x(4)=1.2 , x(5)=1.8 be five points that we wish to cluster. In this problem and in the next, we compute the updated parameters corresponding to cluster 1. You may use any computational tool at your disposal. Compute the following posterior probabilities (provide at least five decimal digits):

1) p(1|1)
2) p(1|2)
3) p(1|3)
4) p(1|4)
5) p(1|5)

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 19:10
Asteam is contained in a rigid tank with a volume of 1 m3. initially, the pressure and temperature are 7 bar and 500 oc, respectively. the temperature drops due to cooling process. determine: (1) the temperature at which condensation begins in °c, (2) the fraction of the total mass that has condensed when the pressure decreased to 0.5 bar. (3) the volume in m3 occupied by saturated liquid at the final state?
Answers: 3
question
Engineering, 04.07.2019 19:10
What is the main objective of using reheat rankine cycle?
Answers: 3
question
Engineering, 04.07.2019 19:20
Aseries piping system conveys methyl alcohol. the system consists of 70 m of 1- nominal pipe follow by 50 m of 2-nominal pipe, both schedule 40 commercial steel. the 1-nominal pipe contains 3 90° elbows (regular) anda fully open gate valve, all threaded. the pressure drop through the system is 150 kpa. determine the volume flow rate through the system that is horizontally laid.
Answers: 1
question
Engineering, 04.07.2019 19:20
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
You know the right answer?
Assume that the initial means and variances of two clusters in a GMM are as follows: μ(1)=−3 , μ(2)=...
Questions
question
Social Studies, 29.05.2021 04:30
question
Chemistry, 29.05.2021 04:30
question
Mathematics, 29.05.2021 04:40
question
Mathematics, 29.05.2021 04:40