Engineering, 06.05.2020 07:18 LikeIke2859
The design of a concrete mix requires 2,314 lb/yd3 of gravel having a moisture content of 3.5% and absorption of 4.2%, and 899 lb/yd3 of sand having a moisture content of 5.7% and absorption of 1.4%, and 244 lb/yd3 of free water. What is the weight of the mixing water per cubic yard that should be used at the job site? Group of answer choices
Answers: 1
Engineering, 04.07.2019 18:10
Asingle-geared blanking press has a stroke of 200 mm and a rated capacity of 320 kn. a cam driven ram is assumed to be capable of delivering the full press load at constant force during the last 15 percent of a constant-velocity stroke. the camshaft has an average speed of 90 rev/min and is geared to the flywheel shaft at a 6: 1 ratio. the total work done is to include an allowance of 16 percent for friction a) estimate the maximum energy fluctuation b) find the rim weight for an effective diameter of 1.2 m and a coefficient of speed fluctuation of 0.10
Answers: 1
Engineering, 04.07.2019 18:10
At 12 noon, the count in a bacteria culture was 400; at 4: 00 pm the count was 1200 let p(t) denote the bacteria cou population growth law. find: (a) an expression for the bacteria count at any time t (b) the bacteria count at 10 am. (c) the time required for the bacteria count to reach 1800.
Answers: 1
Engineering, 04.07.2019 19:10
What is the main objective of using reheat rankine cycle?
Answers: 3
Engineering, 04.07.2019 19:10
What is a monomer? how do they form a ploymer from the view point of chemical bonding?
Answers: 1
The design of a concrete mix requires 2,314 lb/yd3 of gravel having a moisture content of 3.5% and a...
Arts, 22.07.2020 02:01
Health, 22.07.2020 02:01
Computers and Technology, 22.07.2020 02:01
English, 22.07.2020 02:01
Mathematics, 22.07.2020 02:01
History, 22.07.2020 02:01
Mathematics, 22.07.2020 02:01