The total cooling load for a building zone is 200,000 Btu/hr with a sensible heat ratio (SHR) of 0.8. The zone temperature is 74F. The supply air is at a temperature of 54F and a humidity ratio of 0.008 lbm/lbma. Determine (a) the supply airflow rate (cfm) and (b) zone relative humidity. (10 p

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Apiston-cylinder with a volume of 0.25 m3 holds 1 kg of air (r 0.287 k/kgk) at a temperature of 100 c. heat transfer to the cylinder causes an isothermal expansion of the piston until the volume triples. how much heat is added to the piston-cylinder?
Answers: 3
question
Engineering, 04.07.2019 18:10
Coiled springs ought to be very strong and stiff. si3n4 is a strong, stiff material. would you select this material for a spring? explain.
Answers: 2
question
Engineering, 04.07.2019 19:10
What is the main objective of using reheat rankine cycle?
Answers: 3
question
Engineering, 04.07.2019 19:20
List 3 options on how to reduce knocking problens during engine process,
Answers: 2
You know the right answer?
The total cooling load for a building zone is 200,000 Btu/hr with a sensible heat ratio (SHR) of 0.8...
Questions
question
History, 24.11.2019 20:31
question
Mathematics, 24.11.2019 20:31
question
Mathematics, 24.11.2019 20:31
question
English, 24.11.2019 20:31