Engineering, 20.04.2020 19:26 sirinapadeangel
He feeder-selector device at one of the workstations of an assembly machine has a feed rate of 56 components/min and provides a throughput of one part in five. The ideal cycle time of the assembly machine is 6 sec. The low-level sensor on the feed track is set at 10 components, and the high-level sensor is set at 25 components. (a) How long will it take for the supply of components to be depleted from the high-level sensor to the low-level sensor once the feeder-selector device is turned off
Answers: 3
Engineering, 04.07.2019 18:10
Acompressor receives the shaft work to decrease the pressure of the fluid. a)- true b)- false
Answers: 3
Engineering, 04.07.2019 18:10
Thermal stresses are developed in a metal when its a) initial temperature is changed b) final temperature is changed c) density is changed d) thermal deformation is prevented e) expansion is prevented f) contraction is prevented
Answers: 2
Engineering, 04.07.2019 18:10
The higher the astm grain size number, the finer the gran is. a)-true b)-false
Answers: 2
Engineering, 04.07.2019 18:10
True or false (explain) (110)[111] is a slip system in bcc metals . the {111} family in fcc contains 8 planes. resolved shear stress (rss) in single crystals is just related to the applied stress. critical resolved shear stress (crss) in single crystal metals is direct proportional to the number of defects in the structure
Answers: 2
He feeder-selector device at one of the workstations of an assembly machine has a feed rate of 56 co...
Chemistry, 30.05.2021 08:50
History, 30.05.2021 08:50
Social Studies, 30.05.2021 08:50
Social Studies, 30.05.2021 08:50
English, 30.05.2021 08:50
Physics, 30.05.2021 08:50
Chemistry, 30.05.2021 09:00
Business, 30.05.2021 09:00
Chemistry, 30.05.2021 09:00
Biology, 30.05.2021 09:00
Chemistry, 30.05.2021 09:00
English, 30.05.2021 09:00
Health, 30.05.2021 09:00
History, 30.05.2021 09:00
Mathematics, 30.05.2021 09:00
History, 30.05.2021 09:00
Mathematics, 30.05.2021 09:00