The ultimate BOD of a river just below a sewage outfall is 50.0 mg/L, and the DO is at the saturation value of 10.0 mg/L. The deoxygenation rate coefficient kd is 0.30/day, and the reaeration rate coefficient kr is 0.90/day. The river is flowing at the speed of 48.0 miles per day. The only source of BOD on this river is this single outfall.

a. Find the critical distance downstream at which DO is a minimum.
b. Find the minimum DO.
c. If a wastewater treatment plant is to be built, what fraction of the BOD would have to be removed from the sewage to assure a minimum DO of 5.0 mg/L everywhere downstream

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The drive force for diffusion is 7 fick's first law can be used to solve the non-steady state diffusion. a)-true b)-false
Answers: 1
question
Engineering, 04.07.2019 18:10
Which of the following refers to refers to how well the control system responds to sudden changes in the system. a)-transient regulation b)- distributed regulation c)-constant regulation d)-steady-state regulation
Answers: 1
question
Engineering, 04.07.2019 18:10
Ifa component is made of two or more materials with different modulus of elasticity (e), it is called a composite member and we calculate the factor·n". mention the formula for calculating n". also, ifn> 1, explain what will happen to the 1. transformed.gi) ifn 1, what will happen to the material when transformed material when
Answers: 1
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
The ultimate BOD of a river just below a sewage outfall is 50.0 mg/L, and the DO is at the saturatio...
Questions
question
Mathematics, 18.08.2019 21:00
question
Mathematics, 18.08.2019 21:00
question
Mathematics, 18.08.2019 21:00