subject
Engineering, 16.04.2020 00:43 akornegay2

The 1000-lb elevator is hoisted by the pulley system and motor M. If the motor exerts a constant force of 500 lb on the cable, determine the power that must be supplied to the motor at the instant the load has been hoisted s = 15 ft starting from rest. The motor has an efficiency of e = 0.65 Determine the power that must be supplied to the motor at the instant the load has been hoisted s = 35 ft starting from rest.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 19:10
For a process taking place in a closed system containing gas, the volume and pressure relationship is pvi-constant. -1.5 bar, the process starts with initial conditions, pi = =0.03 m3 and ends with final volume, v2-0.05 m3 determine the work done by the gas.
Answers: 2
question
Engineering, 06.07.2019 03:10
Different between right hand turning tool and left hand turning tool ?
Answers: 1
question
Engineering, 06.07.2019 03:20
1kg of water contained in a piston-cylinder assembly undergoes two processes in series from an initial state where the pressure is 3.0 bar and the temperature is 150°c process 1-2: the water is compressed isothermally to a volume of 0.25 m^3 with 120 kj of work being done to the system. process 2-3: the water is heated at constant volume to a final pressure of 10 bar. a. find the change in internal energy for the system. b. calculate the amount of heat transferred, in kj. c. sketch both processes on a t-v diagram. (196.33 kj/kg, 76.33 kj)
Answers: 1
question
Engineering, 06.07.2019 03:20
Aparticle moves along a straight line such that its acceleration is a=(4t^2-2) m/s, where t is in seconds. when t = 0, the particle is located 2 m to the left of the origin, and when t = 2, it is 20 m to the left of the origin. determine the position of the particle when t=4s.
Answers: 1