subject
Engineering, 15.04.2020 23:13 kimjooin02

An undivided multilane highway segment has two 11 ft lanes in the eastbound direction with no shoulders and a 55 mi/h speed limit. This highway segment has 40 access points on a 1.25 mikes, 2.5% upgrade. During the highest 15 minutes of traffic flow within the peak hours there are 755 vehicles and 12% of these are heavy vehicles with a 70%/30% mix of single-unit and tractor-trailer trucks. What are the estimated speed, density, and level of service of upgrade?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
question
Engineering, 04.07.2019 18:10
Acompressor receives the shaft work to decrease the pressure of the fluid. a)- true b)- false
Answers: 3
question
Engineering, 04.07.2019 18:10
Carbon dioxide gas expands isotherm a turbine from 1 mpa, 500 k at 200 kpa. assuming the ideal gas model and neglecting the kinetic and potential energies, determine the change in entropy, heat transfer and work for each kilogram of co2.
Answers: 2
question
Engineering, 04.07.2019 19:10
A)-in the process of engineering design, explain the contribution of material selection. b)- explain the procedure of synthesis as is employed in engineering design. c)- is there any relationship between ergonomics and engineering design? explain. d)- safety consideration in engineering design includes human, product and the enviroment . explain how safety will be incorporated into the design?
Answers: 3
You know the right answer?
An undivided multilane highway segment has two 11 ft lanes in the eastbound direction with no should...
Questions
question
Mathematics, 03.04.2021 01:00
question
Mathematics, 03.04.2021 01:00
question
English, 03.04.2021 01:00
question
Mathematics, 03.04.2021 01:00
question
Arts, 03.04.2021 01:00