subject
Engineering, 15.04.2020 16:56 kcarstensen59070

A corroded metal gusset plate was found on a bridge. It was estimated that the original area of the plate was 750 cm2 and that approximately 2.5 kg had corroded away during use. Assuming a corrosion penetration rate of 0.5 mm/year for this metal, estimate the time since construction of the bridge. The density of the alloy is 10 g/cm3 .

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 03:10
What precautions should you take to prevent injuries when dealing with heavy loads?
Answers: 1
question
Engineering, 04.07.2019 18:10
If a particle moves along a path such that r : (3 sin t) m and ? : 2t rad, where t is in seconds. what is the particle's acceleration in m/s in 4 seconds? a)- 16.43 b)- 16.29 c)- 15.21 d)- 13.79
Answers: 1
question
Engineering, 04.07.2019 18:10
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
question
Engineering, 04.07.2019 18:10
Determine whether or not it is possible to compress air adiabatically from k to 140 kpa and 400 k. what is the entropy change during this process?
Answers: 3
You know the right answer?
A corroded metal gusset plate was found on a bridge. It was estimated that the original area of the...
Questions
question
English, 02.04.2020 01:02