A corroded metal gusset plate was found on a bridge. It was estimated that the original area of the plate was 750 cm2 and that approximately 2.5 kg had corroded away during use. Assuming a corrosion penetration rate of 0.5 mm/year for this metal, estimate the time since construction of the bridge. The density of the alloy is 10 g/cm3. HINT: Weight should be entered in MILLIGRAMS.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
question
Engineering, 04.07.2019 18:10
Slip occurs via two partial dislocations because of (a) the shorter path of the partial dislocation lines; (b) the lower energy state through partial dislocations; (c) the charge balance.
Answers: 1
question
Engineering, 06.07.2019 03:10
Consider two concentric spheres forming an enclosure with diameters of 12 cm and 18 cm the spheres are maintained at uniform temperatures ti-50°c and t2 = 250°c and have emissivities .45 and .8, respectively. determine the net rate of radiation heat transfer between the two spheres per unit surface area.
Answers: 1
question
Engineering, 06.07.2019 03:20
Aparticle moves along a straight line such that its acceleration is a=(4t^2-2) m/s, where t is in seconds. when t = 0, the particle is located 2 m to the left of the origin, and when t = 2, it is 20 m to the left of the origin. determine the position of the particle when t=4s.
Answers: 1
You know the right answer?
A corroded metal gusset plate was found on a bridge. It was estimated that the original area of the...
Questions
question
English, 09.03.2022 15:40
question
Mathematics, 09.03.2022 15:40
question
Mathematics, 09.03.2022 15:50
question
Mathematics, 09.03.2022 15:50
question
English, 09.03.2022 15:50