Engineering, 14.04.2020 18:25 ashleyuchiha123

An inspector must inspect a production batch of 8,000 parts using a gaging method. If the actual fraction defect rate in the batch is 0.02, and the inspector’s accuracy is given by p1 =0.98 and p2 = 0.78, Determine:

a. the number of defects the inspector can be expected to report.
b. the expected number of Type I and Type II errors the inspector will make.
c. What is the expected fraction defect rate that the inspector will report at the end of the inspection task?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
question
Engineering, 04.07.2019 18:10
Slip occurs via two partial dislocations because of (a) the shorter path of the partial dislocation lines; (b) the lower energy state through partial dislocations; (c) the charge balance.
Answers: 1
question
Engineering, 04.07.2019 18:10
Which from the following instrument is commonly used to detect the high pitch butzing sound in bearings? [clo4] a)-digital ultrasonic meter b)-infrared camera c)-spectroscopic d)-vibrometer
Answers: 2
question
Engineering, 04.07.2019 18:10
Journeyman training is usually related (clo2) a)-to specific tasks b)-to cost analysis of maintenance task c)-to control process to ensure quality d)-to installation of machinery
Answers: 2
You know the right answer?
An inspector must inspect a production batch of 8,000 parts using a gaging method. If the actual fra...