subject
Engineering, 09.04.2020 15:38 issaicnotisaac

Meritor hires a team of consultants. The consultants suggest a partial robotic automation, as well as an increase in safety stock to 12.5 percent. Meritor implements these suggestions. The result is an increase in efficiency in both the fabrication of muffler assembly and the making of catalytic converters. The muffler assembly fabrication cell now averages 16 assemblies per hour and the lead time has been decreased to two hours response time for a batch of 10 catalytic converters. How many Kanban cards are now needed?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 19:30
When using the ohmmeter function of a digital multimeter, the leads are placed in what position relative to the component being tested? a. parallel b. control c. series d. line
Answers: 3
question
Engineering, 03.07.2019 23:20
Two technicians are discussing the intake air temperature (iat) sensor. technician a says that the computer uses the iat sensor as a backup to the engine coolant temperature (ect) sensor. technician b says that the powertrain control module (pcm) will subtract the calculated amount of fuel if the air measures hot. who is correct
Answers: 3
question
Engineering, 04.07.2019 18:10
Abrake has a normal braking torque of 2.8 kip in and heat-dissipating cast-iron surfaces whose mass is 40 lbm. suppose a load is brought to rest in 8.0 s from an initial angular speed of 1600 rev/min using the normal braking torque; estimate the temperature rise of the heat dissipating surfaces.
Answers: 3
question
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
You know the right answer?
Meritor hires a team of consultants. The consultants suggest a partial robotic automation, as well a...
Questions
question
Mathematics, 28.11.2020 05:50