subject
Engineering, 08.04.2020 04:35 KennyOaks6230

Two balanced Y-connected loads in parallel are supplied by a balanced, three-phase, 480-volt (line-to-line) source. One load draws 15 kW at 0.6 power factor lagging, and the other load draws 10 kVA at 0.8 power factor leading, a) Draw the power triangle for each load and for the combined load. b) Determine the power factor of the combined load and state whether lagging or leading. c) Determine the magnitude of the line current from the source. d) D-connected capacitors are now installed in parallel with the combined load. What value of capacitive reactance is needed in each leg of the D to make the source power factor unity

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Ariver flows from north to south at 8 km/h. a boat is to cross this river from west to east at a speed of 20 km/h (speed of the boat with respect to the earth/ground). at what angle (in degrees) must the boat be pointed upstream such that it will proceed directly across the river (hint: find the speed of the boat with respect to water/river)? a 288 b. 21.8 c. 326 d. 30.2
Answers: 3
question
Engineering, 04.07.2019 18:10
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
question
Engineering, 04.07.2019 18:10
Afull journal bearing has a journal diameter of 27 mm, with a unilateral tolerance of -0.028 mm. the bushing bore has a diameter of 27.028 mm and a unilateral tolerance of 0.04 mm. the l/d ratio is 0.5. the load is 1.3 kn and the journal runs at 1200 rev/min. if the average viscosity is 50 mpa-s, find the minimum film thickness, the power loss, and the side flow for the minimum clearance assembly.
Answers: 1
question
Engineering, 04.07.2019 18:10
Water in a partially filled large tank is to be supplied to the roof top, which is 8 m above the water level in the tank, through a 2.2-cm-internal-diameter pipe by maintaining a constant air pressure of 300 kpa (gage) in the tank. if the head loss in the piping is 2 m of water, determine the discharge rate of the supply of water to the roof top in liters per second.
Answers: 3
You know the right answer?
Two balanced Y-connected loads in parallel are supplied by a balanced, three-phase, 480-volt (line-t...
Questions
question
Mathematics, 05.12.2019 07:31
question
Mathematics, 05.12.2019 07:31
question
Mathematics, 05.12.2019 07:31
question
Mathematics, 05.12.2019 07:31
question
Mathematics, 05.12.2019 07:31