subject
Engineering, 08.04.2020 00:52 nicolehathaway1012

Edit these for both unnecessary metadiscourse and redundancy. 1. But, on the other hand, we can perhaps point out that there may always be TV programming to appeal to our most prurient and, therefore, lowest interests. 2. In this particular section, I intend to discuss my position about the possible need to dispense with the standard approach to plea bargaining. I believe this for two reasons. The first reason is that there is the possibility of letting hardened criminals avoid receiving their just punishment. The second reason is the following: plea bargaining seems to encourage a growing lack of respect for the judicial system. 3. Turning now to the next question, there is in regard to wilderness area preservation activities one basic

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Afull journal bearing has a journal diameter of 27 mm, with a unilateral tolerance of -0.028 mm. the bushing bore has a diameter of 27.028 mm and a unilateral tolerance of 0.04 mm. the l/d ratio is 0.5. the load is 1.3 kn and the journal runs at 1200 rev/min. if the average viscosity is 50 mpa-s, find the minimum film thickness, the power loss, and the side flow for the minimum clearance assembly.
Answers: 1
question
Engineering, 04.07.2019 19:10
A)-in the process of engineering design, explain the contribution of material selection. b)- explain the procedure of synthesis as is employed in engineering design. c)- is there any relationship between ergonomics and engineering design? explain. d)- safety consideration in engineering design includes human, product and the enviroment . explain how safety will be incorporated into the design?
Answers: 3
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
question
Engineering, 04.07.2019 19:20
In the winter, in order to keep the classroom steadily at 68 f before 10 pm, heating with an average rate of 42,000 btu/hr is provided. assume the outdoor temperature maintains at 32°f, determine the electrical power (kw) required to (a) operate a reversible heat pump (b) operate a real heat pump with a cop (7) of 4.5 and (c) operate an electrical-resistance heater.
Answers: 3
You know the right answer?
Edit these for both unnecessary metadiscourse and redundancy. 1. But, on the other hand, we can perh...
Questions
question
History, 20.04.2021 19:00
question
Social Studies, 20.04.2021 19:00
question
Mathematics, 20.04.2021 19:00
question
History, 20.04.2021 19:00
question
Mathematics, 20.04.2021 19:00