A grader will be used to maintain 3 mils of haul road. It is estimated the work will require removing ruts with two passes in first gear, leveling the road with two passes in second gear, and final shaping of the road with three passes in fourth gear. Use an efficiency factor of 60%. Grader speeds are provided in the chart. Estimate the time requirement for this task.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
question
Engineering, 04.07.2019 16:10
The force on a cutting tool are 2600n vertically downward and 2100 horizontal. determine the resultant force acting on the tool and the angle at which it acts.
Answers: 1
question
Engineering, 04.07.2019 18:10
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
question
Engineering, 04.07.2019 18:20
Most leaks in reciprocating air compressors can be detected and minimized by: (clo4) a)-detecting leakage areas using ultrasonic acoustic detector. b)-tightening joints and connections c)-replacing faulty equipment d)-all of the given options
Answers: 2
You know the right answer?
A grader will be used to maintain 3 mils of haul road. It is estimated the work will require removin...
Questions
question
Mathematics, 26.07.2019 05:00
question
English, 26.07.2019 05:00
question
History, 26.07.2019 05:00