Engineering, 07.04.2020 15:28 zanaplen27
Eagletrons are all-electric automobiles produced by Mogul Motors, Inc. One of the concerns of Mogul Motors is that the Eagletrons be capable of achieving appropriate maximum speeds. To monitor this, Mogul executives take samples of ten Eagletrons at a time. For each sample, they determine the average maximum speed and the range of the maximum speeds within the sample. They repeat this with 35 samples to obtain 35 sample means and 35 ranges. They find that the average sample mean is 103.50 miles per hour, and the average range is 4.00 miles per hour. Using these results, the executives decide to establish an R-chart. They would like this chart to be established so that when it shows that the range of a sample is not within the control limits, there is only approximately a 0.0027 probability that this is due to natural variation. The control limits for the chart based on the above requirement for the given information are: UCL Subscript Upper R overbar = nothing miles per hour (round the reponse to three decimal places). amison Kovach Supply Company manufactures paper clips and other office products. Although inexpensive, paper clips have provided the firm with a high margin of profitability. Sample size is 200 . Results are given for the last 10 samples. Sample 1 2 3 4 5 6 7 8 9 10 Defectives 4 8 3 5 6 5 4 5 2 11 The type of control chart that is best to monitor this process is â–¼ c minus chart x overbar minus chart p minus chart. Eagletrons are all-electric automobiles produced by Mogul Motors, Inc. One of the concerns of Mogul Motors is that the Eagletrons be capable of achieving appropriate maximum speeds. To monitor this, Mogul executives take samples of ten Eagletrons at a time. For each sample, they determine the average maximum speed and the range of the maximum speeds within the sample. They repeat this with 35 samples to obtain 35 sample means and 35 ranges. They find that the average sample mean is 103.50 miles per hour, and the average range is 4.00 miles per hour. Using these results, the executives decide to establish an R-chart. They would like this chart to be established so that when it shows that the range of a sample is not within the control limits, there is only approximately a 0.0027 probability that this is due to natural variation. The control limits for the chart based on the above requirement for the given information are: UCL Subscript Upper R overbar = nothing miles per hour (round the reponse to three decimal places). amison Kovach Supply Company manufactures paper clips and other office products. Although inexpensive, paper clips have provided the firm with a high margin of profitability. Sample size is 200 . Results are given for the last 10 samples. Sample 1 2 3 4 5 6 7 8 9 10 Defectives 4 8 3 5 6 5 4 5 2 11 The type of control chart that is best to monitor this process is â–¼ c minus chart x overbar minus chart p minus chart.
Answers: 2
Engineering, 03.07.2019 15:10
Apiston-cylinder with a volume of 0.25 m3 holds 1 kg of air (r 0.287 k/kgk) at a temperature of 100 c. heat transfer to the cylinder causes an isothermal expansion of the piston until the volume triples. how much heat is added to the piston-cylinder?
Answers: 3
Engineering, 04.07.2019 18:10
Which of the following components of a pid controlled accumulates the error over time and responds to system error after the error has been accumulated? a)- proportional b)- derivative c)- integral d)- on/off.
Answers: 2
Engineering, 04.07.2019 18:20
Steam enters a converging nozzle at 3.0 mpa and 500°c with a at 1.8 mpa. for a nozzle exit area of 32 cm2, determine the exit velocity, mass flow rate, and exit mach number if the nozzle: negligible velocity, and it exits (a) is isentropic (b) has an efficiency of 94 percent
Answers: 2
Engineering, 04.07.2019 18:20
Agas mixture consists of 8 kmol of h2 and 2 kmol of n2. determine the mass of each gas and the apparent gas constant of the mixture.
Answers: 3
Eagletrons are all-electric automobiles produced by Mogul Motors, Inc. One of the concerns of Mogul...
Chemistry, 05.04.2021 06:30
Mathematics, 05.04.2021 06:30
Mathematics, 05.04.2021 06:30
Arts, 05.04.2021 06:30
Computers and Technology, 05.04.2021 06:30
Mathematics, 05.04.2021 06:30
World Languages, 05.04.2021 06:30
Mathematics, 05.04.2021 06:30
English, 05.04.2021 06:30
Mathematics, 05.04.2021 06:30
Social Studies, 05.04.2021 06:30
Mathematics, 05.04.2021 06:30
History, 05.04.2021 06:30