A distillation column with a total condenser and a partial reboiler is separating two feeds. The first feed is a saturated liquid, and its rate is 100.0 kmol/h. This feed is 55.0 mol% methanol, 21.0 mol% ethanol, 23.0 mol% propanol, and 1.0 mol% butanol. The second feed is a saturated liquid with a flow rate of 150.0 kmol/h. This feed is 1.0 mol% methanol, 3.0 mol% ethanol, 26.0 mol% propanol, and 70.0 mol% butanol. We want to recover 99.3% of the propanol in distillate and 99.5% of the butanol in bottoms. Make appropriate assumptions, and find distillate and bottoms flow rates and mole fractions of distillate and bottoms.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Consider a large isothermal enclosure that is maintained at a uniform temperature of 2000 k. calculate the emissive power of the radiation that emerges from a small aperture on the enclosure surface. what is the wavelength ? , below which 10% of the emission is concentrated? what is the wavelength ? 2 above which 10% of the emission is concentrated? determine the wavelength at which maximum spectral emissive power occurs. what is the irradiation incident on a small object placed inside the enclosure?
Answers: 2
question
Engineering, 04.07.2019 18:10
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:10
Water at the rate of 1 kg/s is forced through a tube with a 2.5 cm inner diameter. the inlet water temperature is 15°c, and the outlet water temperature is 50°c. the tube wall temperature is 14°c higher than the local water temperature all along the length of the tube. what is the length of the tube?
Answers: 3
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
A distillation column with a total condenser and a partial reboiler is separating two feeds. The fir...
Questions
question
Mathematics, 09.01.2020 06:31
question
English, 09.01.2020 06:31
question
Mathematics, 09.01.2020 06:31
question
Mathematics, 09.01.2020 06:31
question
History, 09.01.2020 06:31