subject
Engineering, 10.03.2020 20:37 cloeybrown

Your fellow subsea engineer finally returns from her honeymoon dive trip, all tan and rested, talking incessantly about how great it was, etc. etc. While everyone is getting back up to speed on the subsea equipment and recent developments, you are notified that your pipeline permit documentation is not complete for the Red Hawk flowline for GB 877 Well 1 and you need to get the missing information to authorities right away, but the pipeline design company representative is not available.1) What information do you have and/or can be deduced about the Red Hawk flowline? Be as detailed as possible.2) From the information identified, specify what kind of pipeline it is, what the jurisdiction is and the associated permitting requirements?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Abrake has a normal braking torque of 2.8 kip in and heat-dissipating cast-iron surfaces whose mass is 40 lbm. suppose a load is brought to rest in 8.0 s from an initial angular speed of 1600 rev/min using the normal braking torque; estimate the temperature rise of the heat dissipating surfaces.
Answers: 3
question
Engineering, 04.07.2019 18:10
The drive force for diffusion is 7 fick's first law can be used to solve the non-steady state diffusion. a)-true b)-false
Answers: 1
question
Engineering, 04.07.2019 18:20
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
question
Engineering, 04.07.2019 19:10
Acircular aluminum shaft mounted in a journal is shown. the symmetric clearance gap between the shaft and journal is filled with sae 10w-30 oil at t 30°c. the shaft is caused to turn by the attached mass and cord. develop and solve a differential equation for the angular speed of the shaft as a function of time.
Answers: 2
You know the right answer?
Your fellow subsea engineer finally returns from her honeymoon dive trip, all tan and rested, talkin...
Questions
question
Chemistry, 28.01.2020 17:01