Engineering, 06.03.2020 23:18 carterjavon6929

You recently completed a major environmental project for a customer. The deliverable was accepted and your company has been paid. Later, while working on a new project for the same customer, you noticed a possible flaw in the disposal system that was delivered for the earlier project. What would you do first and next (two actions)?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
If the thermal strain developed in polyimide film during deposition is given as 0.0044. assume room temperature is kept at 17.3 c, and thermal coefficient of expansion for the film and the substrate are 54 x 10^-6c^-1 and 3.3 x 10^-6c^-1respectively. calculate the deposition temperature.
Answers: 3
question
Engineering, 04.07.2019 18:10
Water at 70°f and streams enter the mixing chamber at the same mass flow rate, determine the temperature and the quality of the exiting stream. 0 psia is heated in a chamber by mixing it with saturated water vapor at 20 psia. if both streams enters the mixing chamber at the same mass flow rate, determine the temperature and the quality of the existing system.
Answers: 2
question
Engineering, 04.07.2019 18:10
Different types of steels contain different elements that alter the characteristics of the steel. for each of the following elements, explain what the element does when alloyed with steel.
Answers: 2
question
Engineering, 04.07.2019 18:20
Select any two (2) areas of applications of chain-drive. (clo4) a)-permanent lubrication necessary b)-hydraulic forklift truck operation c)-rigging and heavy moving materials d)-relatively high maintenance costs e)-costlier than belt drives
Answers: 2
You know the right answer?
You recently completed a major environmental project for a customer. The deliverable was accepted an...
Questions
question
Mathematics, 16.11.2020 18:20
question
Biology, 16.11.2020 18:30
question
Mathematics, 16.11.2020 18:30