Engineering, 06.03.2020 16:37 lilfofo9
Out of 15 tested fuses 10 failed at 980, 380, 830, 350, 600, 710, 450, 920, 570 and 200 hours respectively. Use MS Excel to do this problem unless stated otherwise. a. Determine the Weibull parameters (η, β) using "Naïve Ranking"
Answers: 1
Engineering, 04.07.2019 18:10
Ariver flows from north to south at 8 km/h. a boat is to cross this river from west to east at a speed of 20 km/h (speed of the boat with respect to the earth/ground). at what angle (in degrees) must the boat be pointed upstream such that it will proceed directly across the river (hint: find the speed of the boat with respect to water/river)? a 288 b. 21.8 c. 326 d. 30.2
Answers: 3
Engineering, 04.07.2019 18:10
Which of the following components of a pid controlled accumulates the error over time and responds to system error after the error has been accumulated? a)- proportional b)- derivative c)- integral d)- on/off.
Answers: 2
Engineering, 04.07.2019 18:10
Which of the following controllers anticipates the future from the slope of errors over time? a)-proportional b)-on/off c)-integral d)-derivative.
Answers: 2
Engineering, 04.07.2019 18:20
Inadequate stores control is not an obstacle to effective work order system. (clo4) a)-true b)-false
Answers: 3
Out of 15 tested fuses 10 failed at 980, 380, 830, 350, 600, 710, 450, 920, 570 and 200 hours respec...
Mathematics, 16.10.2020 18:01
Mathematics, 16.10.2020 18:01
Chemistry, 16.10.2020 18:01
Mathematics, 16.10.2020 18:01
Mathematics, 16.10.2020 18:01
History, 16.10.2020 18:01
Mathematics, 16.10.2020 18:01
Mathematics, 16.10.2020 18:01
Computers and Technology, 16.10.2020 18:01
Mathematics, 16.10.2020 18:01