subject
Engineering, 02.03.2020 20:15 bre2795

A surveyor knows an elevation at Catch Basin to be elev=2156.77 ft. The surveyor takes a BS=2.67 ft on a rod at BM Catch Basin and an FS=6.72 ft on a rod at point X.
What is the elevation at point X? Express your answer to six significant figures.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Compute the pressure drop of 30°c air flowing with a mean velocity of 8 m/s in a circular sheet-metal duct 300 mm in diameter and 15 m long. use a friction factor, f 0.02, and pair = 1.1644 kg/m a. 37.26 pa b. 25.27 pa n c. 29.34 pa d. 30.52 pa
Answers: 1
question
Engineering, 04.07.2019 18:20
Along 8-cm diameter steam pipe whose external surface temperature is 900c connects two buildings. the pipe is exposed to ambient air at 70c with a wind speed of 50 km/hr blowing across the pipe. determine the heat loss from the pipe per unit length. (b) air at 500c enters a section of a rectangular duct (15 cm x 20 cm) at an average velocity of 7 m/s. if the walls of the duct are maintained at 100c. a) the length of the tube for an exit temperature of the air to be 40 0c. b)the rate of heat transfer from the air. c) the fan power needed to overcome the pressure drop in this section of the duct.
Answers: 1
question
Engineering, 04.07.2019 19:10
Analyze the factors that influence the choice between the following pairs of processes to make the products indicated: i) sand casting versus die casting of an electric-motor housing ii) thread rolling versus machining of a bolt for high-strength application. (co3/c5)
Answers: 3
question
Engineering, 04.07.2019 19:20
Acircular pipe of 30mm outside diameter is placed in an airstream at 30 c and latm pressure. the air moves in cross flow over the pipe at 20 m/s, while the outer surface of the pipe is maintained at 110 c. what is the drag force exerted on the pipe per unit length? what is the rate of heat transfer from the pipe per unit length?
Answers: 1
You know the right answer?
A surveyor knows an elevation at Catch Basin to be elev=2156.77 ft. The surveyor takes a BS=2.67 ft...
Questions
question
History, 31.10.2019 17:31
question
Physics, 31.10.2019 17:31