subject
Engineering, 28.02.2020 18:53 gladysspeedie3oxu2ce

You are using a load cell to measure the applied load to a test in the Civil Engineering Structures Lab. What should you do if the measured load does not return to zero? How should youtroubleshoot this to determine if this is a load cell or a mechanical problem?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Afour cylinder four-stroke in-line engine has a stroke of 160mm, connecting rod length of 150mm, a reciprocating mass of 3kg and its firing order is 1-3-4-2. the spacing between cylinders is 100mm. i. show that the engine is in balance with regard to the primary inertia forces and primary 3. a and secondary inertia couples. li determine the out of balance secondary inertia force ii. propose ways of balancing this out of balance force and discuss the challenges that will arise
Answers: 3
question
Engineering, 04.07.2019 18:10
Thermal stresses are developed in a metal when its a) initial temperature is changed b) final temperature is changed c) density is changed d) thermal deformation is prevented e) expansion is prevented f) contraction is prevented
Answers: 2
question
Engineering, 04.07.2019 18:20
Most leaks in reciprocating air compressors can be detected and minimized by: (clo4) a)-detecting leakage areas using ultrasonic acoustic detector. b)-tightening joints and connections c)-replacing faulty equipment d)-all of the given options
Answers: 2
question
Engineering, 04.07.2019 18:20
How much power could a wind turbine produce if it had the following specifications? cp = 0.45 -d=1.2kg/m3 d=50m v 5m/s
Answers: 2
You know the right answer?
You are using a load cell to measure the applied load to a test in the Civil Engineering Structures...
Questions
question
Mathematics, 12.01.2020 18:31
question
Mathematics, 12.01.2020 18:31
question
Mathematics, 12.01.2020 18:31
question
History, 12.01.2020 18:31