subject
Engineering, 27.02.2020 03:20 Isrene

And emergency action plan does which of the following the signs responsibility to those affected and outlines of evacuation routes gives each person their own instructions for them what they need to do an event of any potential event identified emergency that responsibly occur and provides procedures for the warning people about emergency identifies medical responses and options and designate an assembly area labels a type of equipment present at a worksite rides away from employees and family members the information about what is happening

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
question
Engineering, 03.07.2019 15:10
Apiston-cylinder with a volume of 0.25 m3 holds 1 kg of air (r 0.287 k/kgk) at a temperature of 100 c. heat transfer to the cylinder causes an isothermal expansion of the piston until the volume triples. how much heat is added to the piston-cylinder?
Answers: 3
question
Engineering, 04.07.2019 18:10
Abrake has a normal braking torque of 2.8 kip in and heat-dissipating cast-iron surfaces whose mass is 40 lbm. suppose a load is brought to rest in 8.0 s from an initial angular speed of 1600 rev/min using the normal braking torque; estimate the temperature rise of the heat dissipating surfaces.
Answers: 3
question
Engineering, 04.07.2019 18:10
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
You know the right answer?
And emergency action plan does which of the following the signs responsibility to those affected and...
Questions
question
Chemistry, 28.08.2020 09:01
question
Mathematics, 28.08.2020 09:01
question
Advanced Placement (AP), 28.08.2020 09:01
question
Mathematics, 28.08.2020 09:01
question
Physics, 28.08.2020 09:01