subject
Engineering, 25.02.2020 19:55 amandasantiago2001

A 30-mile gravel road requires reshaping and leveling. Estimate the number of hours a grader will be required to complete the project under the following conditions: Two passes at 3 mph Three passes at 4 mph Two passes at 5.5 mph Job efficiency factor: 0.80

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Explain the difference laminar and turbulent flow. explain it with the shear stress and the velocity profiles.
Answers: 1
question
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
question
Engineering, 04.07.2019 18:10
Give heat transfer applications for the following, (i) gas turbines (propulsion) ) gas turbines (power generation). (iii) steam turbines. (iv) combined heat and power (chp). (v) automotive engines
Answers: 1
question
Engineering, 04.07.2019 18:20
For a gate width of 2 m into the paper, determine the force required to hold the gate abc at its location.
Answers: 1
You know the right answer?
A 30-mile gravel road requires reshaping and leveling. Estimate the number of hours a grader will be...
Questions
question
Mathematics, 05.05.2020 01:51
question
Mathematics, 05.05.2020 01:51