subject
Engineering, 12.02.2020 21:31 andyromero

A highway construction project is being undertaken to reduce crash rates. The reconstruction involves a major realignment of the highway such that a 65 mi/h design speed is attained. At one point on the highway, a 800 ft equal tangent crest vertical curve exists. Measurements show that at 4+50 station from PVC, the vertical curve offset is 4 ft. Assess the adequacy of this existing curve in light of the reconstruction design speed of 65 mi/h, and if the existing curve is inadequate, compute a satisfactory curve length.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
If the thermal strain developed in polyimide film during deposition is given as 0.0044. assume room temperature is kept at 17.3 c, and thermal coefficient of expansion for the film and the substrate are 54 x 10^-6c^-1 and 3.3 x 10^-6c^-1respectively. calculate the deposition temperature.
Answers: 3
question
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:10
Different types of steels contain different elements that alter the characteristics of the steel. for each of the following elements, explain what the element does when alloyed with steel.
Answers: 2
question
Engineering, 04.07.2019 18:10
The filament of an incandescent lamp has a temperature of 2000k. calculate the fraction of radiation emitted in the visible light band if the filament is approximated as blackbody
Answers: 2
You know the right answer?
A highway construction project is being undertaken to reduce crash rates. The reconstruction involve...
Questions
question
Spanish, 19.01.2021 08:10
question
Mathematics, 19.01.2021 08:10
question
English, 19.01.2021 08:10
question
Mathematics, 19.01.2021 08:10
question
Mathematics, 19.01.2021 08:10
question
English, 19.01.2021 08:10
question
Mathematics, 19.01.2021 08:10
question
Mathematics, 19.01.2021 08:10