subject
Engineering, 12.02.2020 03:26 TheMixingToad

A contractor is trying to estimate the distance to be expected of a draw-down of 4.81 m from a pumping well under the following conditions:Pumping rate 0.0280 m3/sPumping time 5 1,066 dDrawdown in observation well 5 9.52 mObservation well is located 10.00 m from the pumping wellAquifer material 5 medium sandAquifer thickness 5 14.05 mAssume that the well is fully penetrating in an unconfined aquifer. Report your answer to two decimal places.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
question
Engineering, 03.07.2019 15:10
Ahouse has the following electrical appliance usage (1) single 40w lamp used for 4 hours per day (2) single 60w fan used for 12 hours per day (3) single 200w refrigerator that runs 24 hours per day with compressor run 12 hours and off 12 hours find the solar power inverter size in watt with correction factor of 1.25.
Answers: 1
question
Engineering, 04.07.2019 18:10
Aflywheel accelerates for 5 seconds at 2 rad/s2 from a speed of 20 rpm. determine the total number of revolutions of the flywheel during the period of its acceleration. a.5.65 b.8.43 c. 723 d.6.86
Answers: 2
question
Engineering, 04.07.2019 18:10
Water in a partially filled large tank is to be supplied to the roof top, which is 8 m above the water level in the tank, through a 2.2-cm-internal-diameter pipe by maintaining a constant air pressure of 300 kpa (gage) in the tank. if the head loss in the piping is 2 m of water, determine the discharge rate of the supply of water to the roof top in liters per second.
Answers: 3
You know the right answer?
A contractor is trying to estimate the distance to be expected of a draw-down of 4.81 m from a pumpi...
Questions
question
Geography, 07.12.2019 12:31
question
Mathematics, 07.12.2019 12:31