subject
Engineering, 28.01.2020 06:31 memos5502

Why is the contractor normally required to submit a bid bond when making a proposal to an owner on a competitively bid contract?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:20
Amixture of slurry and mud is to be pumped through a horizontal pipe of diameter 500 mm. the fluid behaves as a bingham plastic with a yield stress of 30 pa and viscosity 0.04 pa.s. describe the effects of the shear stress through a transverse section of the pipe by plotting the variation in shear stress and velocity profile: (i) just before the slurry starts to move (ii) as the slurry flows when the pressure gradient is double that in part (i)
Answers: 3
question
Engineering, 04.07.2019 19:10
Acircular aluminum shaft mounted in a journal is shown. the symmetric clearance gap between the shaft and journal is filled with sae 10w-30 oil at t 30°c. the shaft is caused to turn by the attached mass and cord. develop and solve a differential equation for the angular speed of the shaft as a function of time.
Answers: 2
question
Engineering, 04.07.2019 19:20
Heat transfer by is the fastest mode of heat transfer that requires no intervening medium. a)-conduction b)-convection c)-radiation d)-conduction and convection
Answers: 1
question
Engineering, 06.07.2019 03:20
Steam at a pressure of 100 kpa and a quality of 50% initially fills a rigid vessel having a volume of 0.5 m^3. the steam is then heated, causing the pressure in the vessel to rise to 150 kpa. determine: i. the mass of the steam in the vessel. ii. the temperature and quality of the steam after the heating process. ii the mass of the vapour, mg and liquid, m in the vessel after the heating process. if the steam in the vessel is now further heated, what would the pressure and temperature in the vessel be when all steam has turned into saturated vapour? b. sketch the processes in part (a) and part (b) on p-v and t-v diagrams, indicating clearly the temperatures, pressures and the paths. c. (0.59kg, 111.4°c, 73%, 0.4307kg, 0.1 593kg, 2.11 bar, 121.84°c)
Answers: 1
You know the right answer?
Why is the contractor normally required to submit a bid bond when making a proposal to an owner on a...
Questions