subject
Engineering, 25.01.2020 00:31 diego481

The net work output and the thermal efficiency for the carnot and the simple ideal rankine cycles with steam as the working fluid are to be calculated and compared. steam enters the turbine in both cases at 5 mpa as a saturated vapor and the condenser pressure is 50 kpa. in the rankine cycle, the condenser exit state is saturated liquid and in the carnot cycle, the boiler inlet state is saturated liquid. draw the t-s diagrams for both cycles.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
question
Engineering, 04.07.2019 18:10
Aturning operation is performed with following conditions: rake angle of 12Ā°, a feed of 0.35 mm/rev, and a depth of cut of 1.1 mm. the work piece is aluminum alloy 6061 with t6 heat treatment (a16061-t6). the resultant chip thickness was measured to be 1.0 mm. estimate the cutting force, fc. use shear stress of 207 mpa and coefficient of friction on the tool face of 0.6.
Answers: 1
question
Engineering, 04.07.2019 18:20
Determine the damped natural frequencies and the steady state response of a decoupled damped forced two degrees of freedom system. 10Ƥ1 + 2q1 20q1 10 cos t; 10q2 +4q2 + 40q2 10 cos t
Answers: 3
question
Engineering, 04.07.2019 18:20
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150Ā°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175Ā°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25Ā°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150Ā°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25Ā°c, respectively. if the panel is placed in the oven at an initial temperature of 25Ā°c and removed from the chamber at a safe-to-touch tempera ture of 37Ā°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
You know the right answer?
The net work output and the thermal efficiency for the carnot and the simple ideal rankine cycles wi...
Questions
question
Mathematics, 29.08.2020 01:01
question
Mathematics, 29.08.2020 01:01
question
Geography, 29.08.2020 01:01