subject
Engineering, 15.01.2020 19:31 cactuskatherine

Which goal incorporates most of the criteria required for a smart goal?

a.

ann intends to become a qualified pilot before she turns 21.

b.

colin loves music, has a good sense of rhythm, and intends to make a career in sound recording.

c.

debbie is an extrovert, loves to travel, and plans to get a travel-related diploma and then a job that involves travel.

d.

francis has a flair for languages and plans to become a writer or a journalist in a few years.

e.

zeenat plans to become a kindergarten teacher; she has a part-time job to finance her education and plans to obtain her graduate degree in education in three years.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
question
Engineering, 04.07.2019 19:10
Starting wih an energy balance on a rectangular volume element, derive the one- dimensional transient heat conduction equation for a plane wall with constant thermal conductivity and no heat generation.
Answers: 1
question
Engineering, 04.07.2019 19:20
Heat transfer by is the fastest mode of heat transfer that requires no intervening medium. a)-conduction b)-convection c)-radiation d)-conduction and convection
Answers: 1
question
Engineering, 04.07.2019 19:20
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
You know the right answer?
Which goal incorporates most of the criteria required for a smart goal?

a.

...
Questions
question
Mathematics, 10.04.2020 20:09