subject
Engineering, 03.01.2020 07:31 genyjoannerubiera

True/false
if a contractor chooses to use their own quality system, they must demonstrate compliance with the established military standard through formal third party certification. [identify dod policy regarding basic quality systems and the role of iso 9001.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:20
Steam enters a converging nozzle at 3.0 mpa and 500°c with a at 1.8 mpa. for a nozzle exit area of 32 cm2, determine the exit velocity, mass flow rate, and exit mach number if the nozzle: negligible velocity, and it exits (a) is isentropic (b) has an efficiency of 94 percent
Answers: 2
question
Engineering, 04.07.2019 18:20
An engine runs on the ideal diesel cycle. the cycle has a compression ratio of 20 and a cutoff ratio of 2. the highest temperature in the cycle is 1200 k. if the heat into the system is 300 kj/kg of working fluid and using variable specific heats determine the work produced per mass of working fluid
Answers: 3
question
Engineering, 04.07.2019 19:20
The process in which the system pressure remain constant is called a)-isobaric b)-isochoric c)-isolated d)-isothermal
Answers: 3
You know the right answer?
True/false
if a contractor chooses to use their own quality system, they must demonstrate comp...
Questions
question
Mathematics, 29.07.2019 12:30