subject
Engineering, 23.12.2019 20:31 arivalen

1) pareto charts are used to: a) identify inspection points in a process. b) outline production schedules. c) organize errors, problems, or defects. d) show material flow. e) show the range of values of a measurement and the frequency with which each value occurs.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
An air conditioning system consist of a 5 cm diameter pipe, operating at a pressure of 200 kpa. the air initially enters the pipe at 15°c with a velocity of 20 m/s and relative humidity of 80%. if the heat supply throughout the process is 960 w, determine the relative humidity and the temperature at the outlet
Answers: 3
question
Engineering, 04.07.2019 18:10
Coiled springs ought to be very strong and stiff. si3n4 is a strong, stiff material. would you select this material for a spring? explain.
Answers: 2
question
Engineering, 04.07.2019 18:10
Which of the following refers to refers to how well the control system responds to sudden changes in the system. a)-transient regulation b)- distributed regulation c)-constant regulation d)-steady-state regulation
Answers: 1
question
Engineering, 04.07.2019 18:10
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
You know the right answer?
1) pareto charts are used to: a) identify inspection points in a process. b) outline production sch...
Questions
question
History, 25.01.2021 22:40
question
Health, 25.01.2021 22:40
question
Mathematics, 25.01.2021 22:40
question
Mathematics, 25.01.2021 22:40
question
English, 25.01.2021 22:40
question
Mathematics, 25.01.2021 22:40