Engineering, 20.12.2019 05:31 jaustin1961

Aflux-cored arc-welding process is used to join two low-alloy steel plates at a 90° angle. the joint is an outside fillet weld. the plates are 1⁄4-in thick. the weld bead consists of 55% metal from the electrode and 45% from the steel plates. the heat transfer factor for fcaw = 0.9, and the melting factor = 0.65. welding current = 120 amps, and voltage = 20 volts. velocity of the welding head = 25 in/min. electrode wire diameter = 0.125 in. a core of flux (compounds that do not become part of the weld bead) runs through the center of the electrode. the diameter of the core = 0.0625 in. (a) what is the cross-sectional area of the weld bead? (b) how fast must the electrode wire be fed into the welding operation?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Afour cylinder four-stroke in-line engine has a stroke of 160mm, connecting rod length of 150mm, a reciprocating mass of 3kg and its firing order is 1-3-4-2. the spacing between cylinders is 100mm. i. show that the engine is in balance with regard to the primary inertia forces and primary 3. a and secondary inertia couples. li determine the out of balance secondary inertia force ii. propose ways of balancing this out of balance force and discuss the challenges that will arise
Answers: 3
question
Engineering, 04.07.2019 18:10
The higher the astm grain-size number, the coarser the grain is. a)-true b)-false
Answers: 3
question
Engineering, 04.07.2019 18:20
For each of the following process: a) sketch the p-v diagram, b)sketch t-s diagram, c) sketch t-v diagram, d) sketch the boundary work on one of the diagrams (a, b or c) and e) sketch the reversible heat transfer on one of the diagrams (a, b or c): 1- isobaric process from compressed liquid to superheated vapor 2- isothermal process from compressed liquid to superheated vapor 3- isentropic process from compressed liquid to superheated vapor
Answers: 3
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
Aflux-cored arc-welding process is used to join two low-alloy steel plates at a 90° angle. the joint...
Questions
question
Mathematics, 26.02.2021 05:30
question
Social Studies, 26.02.2021 05:30
question
Advanced Placement (AP), 26.02.2021 05:30
question
Social Studies, 26.02.2021 05:30