Apre-timed four-timing-stage signal has critical lane group flow rates for the first three timing stages of 200, 187, and 210 veh/h (saturation flow rates are 1800 veh/h/ln for all timing stages). the lost time is known to be 4 seconds for each timing stage. if the cycle length is 60 seconds, what is the estimated effective green time of the fourth timing stage?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 12:10
On a average work day more than work place firs are reorted
Answers: 1
question
Engineering, 04.07.2019 18:10
Water in a partially filled large tank is to be supplied to the roof top, which is 8 m above the water level in the tank, through a 2.2-cm-internal-diameter pipe by maintaining a constant air pressure of 300 kpa (gage) in the tank. if the head loss in the piping is 2 m of water, determine the discharge rate of the supply of water to the roof top in liters per second.
Answers: 3
question
Engineering, 04.07.2019 19:10
Air inially occupying a volume of 1 m2 at 100 kpa, 27 c undergoes three internally reversible processes in series. process 1-2 compression to 500 kpa during which pv constant process 2-3 adiabatic expanslon to 100 kpa process 3-1: constant-pressure expansion to 100 kpa (a) calculate the change of entropy for each of the three processes. (b) calculate the heat and work involved in each process. (c) is this cycle a power cycle or refrigeration cycle?
Answers: 3
question
Engineering, 04.07.2019 19:20
Apiping systems consists of 6 m of 6-std type k and 12 m of 4-std type k, both drawn copper tubing. the system conveys ethylene glycol at a rate of 0.013 m3/s. the pressure drop across the system is to be calculated. there are two 90° elbows in the 6-in pipe, a reduction from the 6-in pipe to the 4-in pipe and four 90° elbows in the 4-in pipe. all fittings are soldered (same as flanged) and regular. the inlet and outlet of the system are at the same height.
Answers: 1
You know the right answer?
Apre-timed four-timing-stage signal has critical lane group flow rates for the first three timing st...
Questions
question
Mathematics, 25.08.2019 16:30
question
Geography, 25.08.2019 16:30
question
Mathematics, 25.08.2019 16:30