subject
Engineering, 19.12.2019 19:31 lenaaemersonn2

King khan corporation (kkc) manufactures kongs and kangs, the production of which requires considerable energy. power generation department costs amounted to $4 million this month, for a total of 50 million kilowatt hours (kwh) supplied to the plant. analysis shows that 40% of power generation costs are fixed. this month the kang dept. made 5 million kangs, each using 4 kwh, and the kang dept. made 4 million kangs, each using 6 kwh. if kkc uses the simplest algorithm to allocate power costs, which is not true?

a. kong will be charged $1.6 million

b. kang will be charged $2.18 million

c. kang’s charge will depend on kong’s usage

d. since the production departments consume the vast majority of the plant’s power costs, it is not cost-efficient to allocate power costs to the service departments

e. all are true

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Two flowing streams of argon gas are adiabatically mixed to form a single flow/stream. one stream is 1.5 kg/s at 400 kpa and 200 c while the second stream is 2kg/s at 500 kpa and 100 ? . it is stated that the exit state of the mixed single flow of argon gas is 150 c and 300 kpa. assuming there is no work output or input during the mixing process, does this process violate either the first or the second law or both? explain and state all your assumptions.
Answers: 1
question
Engineering, 04.07.2019 18:10
Different types of steels contain different elements that alter the characteristics of the steel. for each of the following elements, explain what the element does when alloyed with steel.
Answers: 2
question
Engineering, 04.07.2019 18:10
Slip occurs via two partial dislocations because of (a) the shorter path of the partial dislocation lines; (b) the lower energy state through partial dislocations; (c) the charge balance.
Answers: 1
question
Engineering, 04.07.2019 18:10
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
You know the right answer?
King khan corporation (kkc) manufactures kongs and kangs, the production of which requires considera...
Questions
question
Mathematics, 13.02.2020 02:06