Anon-pipelined system takes 100ns to process a task. the same task can be processed in a 5-segment pipeline with a clock cycle of 20ns.

a. determine the speedup ratio of the pipeline for 100 tasks.

b. determine the speedup ratio of the pipeline for 20 tasks.

c. determine the speedup ratio of the pipeline for 1 task.

d. what is the maximum speedup that could be achieved with the pipeline unit over the non-pipelined unit?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The higher the astm grain-size number, the coarser the grain is. a)-true b)-false
Answers: 3
question
Engineering, 04.07.2019 18:10
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
question
Engineering, 04.07.2019 18:10
Journeyman training is usually related (clo2) a)-to specific tasks b)-to cost analysis of maintenance task c)-to control process to ensure quality d)-to installation of machinery
Answers: 2
question
Engineering, 04.07.2019 18:20
Steam enters a converging nozzle at 3.0 mpa and 500°c with a at 1.8 mpa. for a nozzle exit area of 32 cm2, determine the exit velocity, mass flow rate, and exit mach number if the nozzle: negligible velocity, and it exits (a) is isentropic (b) has an efficiency of 94 percent
Answers: 2
You know the right answer?
Anon-pipelined system takes 100ns to process a task. the same task can be processed in a 5-segment p...
Questions
question
Mathematics, 23.10.2019 08:00
question
Spanish, 23.10.2019 08:00
question
Mathematics, 23.10.2019 08:00
question
Mathematics, 23.10.2019 08:00