subject
Engineering, 23.11.2019 05:31 mattmaddox86

Aprogram is seeded with 30 faults. during testing, 21 faults are detected, 15 of which are seeded faults and 6 of which are indigenous faults. what is the mill's estimate of the number of indigenous faults remaining undetected in the program?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Which of the following components of a pid controlled accumulates the error over time and responds to system error after the error has been accumulated? a)- proportional b)- derivative c)- integral d)- on/off.
Answers: 2
question
Engineering, 04.07.2019 18:20
Have a greater impact on maintenance productivity than any other support group. (clo5) a)-the top management b)-inventory and purchasing c)-sub-contracting d)-cmms
Answers: 2
question
Engineering, 04.07.2019 18:20
Wiy doeres rere okhn a pump whon working betwon the same pressure range?
Answers: 2
question
Engineering, 04.07.2019 19:10
A)-in the process of engineering design, explain the contribution of material selection. b)- explain the procedure of synthesis as is employed in engineering design. c)- is there any relationship between ergonomics and engineering design? explain. d)- safety consideration in engineering design includes human, product and the enviroment . explain how safety will be incorporated into the design?
Answers: 3
You know the right answer?
Aprogram is seeded with 30 faults. during testing, 21 faults are detected, 15 of which are seeded fa...
Questions
question
Chemistry, 17.11.2020 01:00
question
Business, 17.11.2020 01:00
question
Mathematics, 17.11.2020 01:00
question
Mathematics, 17.11.2020 01:00