subject
Engineering, 19.11.2019 02:31 justnbri

Ehanging bridge over one ship canal blocks traffic (both northbound and southbound directions) for 2 minutes every time it is lifted. there are two lanes for each direction. the capacity for each direction is 3600 veh/hr. assuming d/d/1 queuing, if the northbound flow rate is 2100 veh/hr and the southbound one is 1800 veh/hr, what is the total delay caused by each lift of the hanging bridge

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 19:30
When using the ohmmeter function of a digital multimeter, the leads are placed in what position relative to the component being tested? a. parallel b. control c. series d. line
Answers: 3
question
Engineering, 04.07.2019 18:10
Water at 55c flows across a flat plate whose surface temperature is held constant at 95c. if the temperature gradient at the plate's surface for a given value of x is 18 c/mm, find a) local heat transfer coefficient. b) heat flux
Answers: 3
question
Engineering, 04.07.2019 18:20
Most leaks in reciprocating air compressors can be detected and minimized by: (clo4) a)-detecting leakage areas using ultrasonic acoustic detector. b)-tightening joints and connections c)-replacing faulty equipment d)-all of the given options
Answers: 2
question
Engineering, 04.07.2019 19:10
What is the main objective of using reheat rankine cycle?
Answers: 3
You know the right answer?
Ehanging bridge over one ship canal blocks traffic (both northbound and southbound directions) for 2...
Questions
question
Mathematics, 10.10.2021 17:30