subject
Engineering, 18.11.2019 21:31 reaperqueen21

For this problem, assume that all branches are perfectly predicted (this eliminates all control hazards) and that no delay slots are used. if we only have one memory (for both instructions and data), there is a structural hazard every time we need to fetch an instruction in the same cycle in which another instruction accesses data. to guarantee forward progress, this hazard must always be resolved in favor of the instruction that accesses data. what is the total execution time of this instruction sequence in the 5-stage pipeline that only has one memory? we have seen that data hazards can be eliminated by adding nops to the code. can you do the same with this structural hazard? why?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
At 12 noon, the count in a bacteria culture was 400; at 4: 00 pm the count was 1200 let p(t) denote the bacteria cou population growth law. find: (a) an expression for the bacteria count at any time t (b) the bacteria count at 10 am. (c) the time required for the bacteria count to reach 1800.
Answers: 1
question
Engineering, 04.07.2019 18:20
Avolume of 2.65 m3 of air in a rigid, insulated container fitted with a paddle wheel is initially at 264 k, 5.6 bar. the air receives 432 kj by work from the paddle wheel. assuming the ideal gas model with cv = 0.71 kj/kg • k, determine for the air the amount of entropy produced, in kj/k
Answers: 2
question
Engineering, 04.07.2019 19:20
Asimple speed reducer is composed of 2 spur gears. the pinion gear has a pitch diameter of 0.75" and 36 teeth while the driven gear has a pitch diameter of 4.0" and 192 teeth. a)-what is the diametral pitch of each gear? b)-if an electric motor rotating ccw at 3000 rpm is coupled to the pinion, what is the rotational speed of the driven gear? c)-if the torque delivered to the pinion is 1 n-m, what is the torque on the driven gear? d)-what is the power transmitted by the gear train?
Answers: 1
question
Engineering, 06.07.2019 04:30
Describe briefly, the concept of mass production in modern industrial system.
Answers: 1
You know the right answer?
For this problem, assume that all branches are perfectly predicted (this eliminates all control haza...
Questions