subject
Engineering, 10.11.2019 03:31 asco0317p34v1s

In cell g8 in the summary worksheet, insert a date function to calculate the number of years between 1/1/2018 in cell h2 and the last remodel date in the last remodel column (cell f8). use relative and mixed references correctly. copy the function to the range g9: g57. unit 101 was last remodeled 13.75 years ago. ensure that the function you use displays that result.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Heat is added to a piston-cylinder device filled with 2 kg of air to raise its temperature 400 c from an initial temperature of t1 27 cand pressure of pi 1 mpa. the process is isobaric process. find a)-the final pressure p2 b)-the heat transfer to the air.
Answers: 1
question
Engineering, 03.07.2019 19:30
When using the ohmmeter function of a digital multimeter, the leads are placed in what position relative to the component being tested? a. parallel b. control c. series d. line
Answers: 3
question
Engineering, 04.07.2019 08:10
Which of the following is an easy way to remember the modified “x” tire rotation? a. nondrive wheels straight, cross the drive wheels b. drive wheels straight, cross the nondrive wheels c. drive wheels crossed, nondrive wheels straight d. drive wheels crossed, nondrive wheels crossed
Answers: 1
question
Engineering, 04.07.2019 18:10
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
You know the right answer?
In cell g8 in the summary worksheet, insert a date function to calculate the number of years between...
Questions
question
Mathematics, 09.12.2020 21:40
question
Mathematics, 09.12.2020 21:40
question
English, 09.12.2020 21:40
question
Mathematics, 09.12.2020 21:40