Assume we braze two thin-walled high-strength low-alloy steel tubes together with a sleeve joint. calculate the overlap length that is needed to ensure that the joint is stronger than the tubes. for the joint’s shear strength, a value of 20 mpa is typical. (10 points) hint: in this comparison you will find that the tube diameter drops out of the equation. you will still need to assume a certain tube wall thickness though, and you will also need an assumption for the tensile strength of low alloy steel (which you can get from any good materials database).

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 16:10
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
question
Engineering, 04.07.2019 18:10
An air conditioning system consist of a 5 cm diameter pipe, operating at a pressure of 200 kpa. the air initially enters the pipe at 15°c with a velocity of 20 m/s and relative humidity of 80%. if the heat supply throughout the process is 960 w, determine the relative humidity and the temperature at the outlet
Answers: 3
question
Engineering, 04.07.2019 18:10
Fluids at rest possess no flow energy. a)- true b)- false
Answers: 3
question
Engineering, 04.07.2019 18:20
How much power could a wind turbine produce if it had the following specifications? cp = 0.45 -d=1.2kg/m3 d=50m v 5m/s
Answers: 2