subject
Engineering, 25.10.2019 01:43 ARAYAMYHAND

Athermocouple, with a spherical junction diameter of 0.5 mm, is used for measuring the temperature of hot air flow in a circular duct. the convection heat transfer coefficient of the air flow can be related with the diameter (d) of the sphere and the average air flow velocity (v) as h = 2.2(v /d)0.5, where d, h, and v are in m, w/m2•k, and m/s, respectively. the properties of the thermocouple junction are k = 35 w/m•k, rho = 8500 kg/m3, and cp = 320 j/kg•k. the maximum response time of the thermocouple to record 78 percent of the initially applied temperature difference is 5 s. determine the minimum air flow velocity that the thermocouple can be used.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Ahouse has the following electrical appliance usage (1) single 40w lamp used for 4 hours per day (2) single 60w fan used for 12 hours per day (3) single 200w refrigerator that runs 24 hours per day with compressor run 12 hours and off 12 hours find the solar power inverter size in watt with correction factor of 1.25.
Answers: 1
question
Engineering, 04.07.2019 18:20
Modern high speed trains do not have perpendicular expansion gaps where rails are joined end-to-end any more they are mostly welded together but what might happen if there was a spell of particularly hot weather that causes inspection of the tracks?
Answers: 1
question
Engineering, 04.07.2019 19:10
What is the chief metrological difference between measuring with a microscope and with an electronic comparator? a. the microscope is limited to small workpieces.a. the microscope is limited to small workpieces. c. the comparator can only examine one point on the workpiece. d. the microscope carries its own standard.
Answers: 1
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
Athermocouple, with a spherical junction diameter of 0.5 mm, is used for measuring the temperature o...
Questions
question
Mathematics, 26.02.2020 05:57