subject
Engineering, 13.10.2019 17:30 miamassimino

Risk assessment

section 1

produce a short report on how to undertake a risk assessment. (1000 words, must include references, text and images)

section 2

undertake a risk assessment using the following information for the work item described.
•part of the roadway outside the construction site has become damaged by the excavation lorries. it requires to be repaired in order to prevent the closure of that entrance onto the site by the local authority highways department.

•an emergency repair is proposed with quick setting concrete, but the roadway will require closure for 12 hours during this work.

•the work will be undertaken using a wheeled excavator, two ground-workers, a floor saw and three bags of quick setting concrete, along with a traffic lights control, cones and ensure that you follow the 'five steps to risk assessment')

section 3

justify the contents of a risk assessment you carried out in section 2, include you're justification for decisions made in terms of the consequences of risk, based on a clear definition of what is meant by reasonably practicable'. (500 words)

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Determine whether or not it is possible to compress air adiabatically from k to 140 kpa and 400 k. what is the entropy change during this process?
Answers: 3
question
Engineering, 04.07.2019 18:10
Shafts are machine elements that are used to a) carry axial loads b) direct shear loads c) transmit power d) rotate at constant speed e) none of the above circular and square shafts subjected to the same torque under the same circum behave a) the same way b) almost the same way
Answers: 2
question
Engineering, 04.07.2019 18:20
Steam enters a converging nozzle at 3.0 mpa and 500°c with a at 1.8 mpa. for a nozzle exit area of 32 cm2, determine the exit velocity, mass flow rate, and exit mach number if the nozzle: negligible velocity, and it exits (a) is isentropic (b) has an efficiency of 94 percent
Answers: 2
question
Engineering, 04.07.2019 19:10
What is a monomer? how do they form a ploymer from the view point of chemical bonding?
Answers: 1
You know the right answer?
Risk assessment

section 1

produce a short report on how to undertake a ris...
Questions
question
Social Studies, 28.06.2021 21:20
question
Mathematics, 28.06.2021 21:20
question
History, 28.06.2021 21:20