subject
Engineering, 07.10.2019 16:30 brianquinnholop6049c

Apre-engineering baseline was run down a very steep hill. rather than measure horizontally downhill with the steel tape, the surveyor measures the vertical angle with a theodolite and the slope distance with a 200-ft steel tape. the vertical angle is -21° 26’ turned to a point on a plumbed range pole that is 4.88 ft above the ground. the slope distance from the theodolite to the point on the range pole is 148.61 ft. the theodolite’s optical center is 4.66 ft above the upper baseline station at 110 + 71.25. (a) if the elevation of the upper station is 318.71, what is the elevation of the lowerstation?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 19:30
When using the ohmmeter function of a digital multimeter, the leads are placed in what position relative to the component being tested? a. parallel b. control c. series d. line
Answers: 3
question
Engineering, 04.07.2019 18:10
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:10
Manometers are good examples of measuring instruments, nowadays they are not as common as before. a)-capacitive probe gauges b)-gravitational gauges deformation ) gauges d)-digital gauges
Answers: 1
question
Engineering, 04.07.2019 18:10
Water at the rate of 1 kg/s is forced through a tube with a 2.5 cm inner diameter. the inlet water temperature is 15°c, and the outlet water temperature is 50°c. the tube wall temperature is 14°c higher than the local water temperature all along the length of the tube. what is the length of the tube?
Answers: 3
You know the right answer?
Apre-engineering baseline was run down a very steep hill. rather than measure horizontally downhill...
Questions
question
English, 04.01.2021 14:00
question
Health, 04.01.2021 14:00
question
Engineering, 04.01.2021 14:00
question
Arts, 04.01.2021 14:00
question
Mathematics, 04.01.2021 14:00