subject
Engineering, 06.10.2019 06:00 JAlvelo

Determine the optimal number of hours to use machines a and b to excavate and grade a cul-de-sac at minimum cost. solve using graphical method. given a construction site has machines that simultaneously excavate and grade machine a grades: ga = 18.9 unit h-1 and excavates: ea = 15.5 unit h-1 the cost to operate machine a is: ca = 101 $ h-1 machine b grades: gb = 10.2 unit h-1 and excavates: eb = 23.2 unit h-1 the cost to operate machine b is: cb = 1.10e2 $ h-1 each machine can be assigned to the cul-de-sac for no more than 10 hours. amount of grading: g = 100 unit amount of excavating: e = 150 unit "units" here are a measure of volume

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Ahouse has the following electrical appliance usage (1) single 40w lamp used for 4 hours per day (2) single 60w fan used for 12 hours per day (3) single 200w refrigerator that runs 24 hours per day with compressor run 12 hours and off 12 hours find the solar power inverter size in watt with correction factor of 1.25.
Answers: 1
question
Engineering, 04.07.2019 08:10
Which of the following is an easy way to remember the modified “x” tire rotation? a. nondrive wheels straight, cross the drive wheels b. drive wheels straight, cross the nondrive wheels c. drive wheels crossed, nondrive wheels straight d. drive wheels crossed, nondrive wheels crossed
Answers: 1
question
Engineering, 04.07.2019 18:10
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
question
Engineering, 04.07.2019 18:10
Water at the rate of 1 kg/s is forced through a tube with a 2.5 cm inner diameter. the inlet water temperature is 15°c, and the outlet water temperature is 50°c. the tube wall temperature is 14°c higher than the local water temperature all along the length of the tube. what is the length of the tube?
Answers: 3
You know the right answer?
Determine the optimal number of hours to use machines a and b to excavate and grade a cul-de-sac at...
Questions
question
Arts, 04.12.2020 01:00
question
Mathematics, 04.12.2020 01:00
question
Biology, 04.12.2020 01:00