subject
Engineering, 04.10.2019 19:10 mmcdaniels46867

The nameplate on a 70 kva transformer shows a primary voltage of 480 volts and a secondary voltage of 115 volts. we wish to determine the approximate number of turns on the primary and secondary windings. toward this end, three turns of wire are would around the external winding, and a voltmeter is connected across this 3-turn coil. a voltage of 50 volts is applied to the 115 volt winding and the voltage across the 3-turn winding is found to be 0.77 volts. how many turns are there on the 480 v and 115 volt windings (approximately)?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 16:10
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
question
Engineering, 04.07.2019 18:10
Aloaded platform of total mass 500 kg is supported by a dashpot and by a set of springs of effective stiffness 72 kn/m. it is observed that when the platform is depressed through a distance x = 12.5 cm below its equilibrium position and then released without any initial velocity; it reaches its equilibrium position in the shortest possible time without overshoot. find the position and velocity of the loaded platform 0.10 sec. after its release. if a further load of 400 kg is added to the platform, find, i) the frequency of damped vibrations, and i) the amplitude of vibration after 2 complete oscillations, given that the initial amplitude is 15 cm.
Answers: 1
question
Engineering, 04.07.2019 18:10
Which of the following ziegler nichols tuning methods the response of the controller to a step input should exhibit an s-shaped curve? a)-open loop mode b)-closed loop mode c)-both modes (open & closed) d)-none of the modes (open & closed)
Answers: 3
question
Engineering, 04.07.2019 18:10
Journeyman training is usually related (clo2) a)-to specific tasks b)-to cost analysis of maintenance task c)-to control process to ensure quality d)-to installation of machinery
Answers: 2
You know the right answer?
The nameplate on a 70 kva transformer shows a primary voltage of 480 volts and a secondary voltage o...
Questions
question
Mathematics, 12.11.2020 16:50
question
Mathematics, 12.11.2020 16:50